Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
The project encompasses:
50,000 m2 of two layers of asphalt concrete covering
Development of 3 bridges totaling 120 meters
A 380-meter-long tunnel
Development of retaining walls
Water pipes installation